Pathway repairs Wyebank

February is drawing to a close and mid week the river was looking in superb condition at Wyebank. I have started work on pathway repairs. The banks are prone to both erosion and the re-depositing of silt. The latter allows recutting and revetting to be done quite successfully without bringing in new materials. Where possible I am trying to do away with steps and replace them with sloping paths, which are generally much easier to maintain.